From the distribution grid to the last socket. One responsibility.
Every step the power takes, from the 22 kV line to the machines in your hall, is designed, installed and certified by us. No handovers between five different suppliers.
Switchrooms and halls that are running

A roof that earns money during the day
An industrial hall has a large flat roof and its highest consumption during the day. We design the solar plant straight into the electrical drawings — one switchroom, one inspection report, no retrofitting.
1,000 kWp
typical rooftop solar plant on a 10,000 m² hall
70%
of output consumed directly in the hall
6–8 years
From the transformer station to the last distribution board
Numbers you can verify

Of cable routes
Power distribution, lighting and low-voltage systems in industrial halls and sites.
5 MW
of installed capacity in industrial halls
Transformer stations, LV/MV switchrooms, distribution, lighting and solar — from design to the inspection report.
No need to coordinate five electrical contractors

One design, one switchroom, one inspection report.
Power distribution, lighting, solar, switchboards and controls from one supplier — one contract, one deadline.
Guarantees for the investor
What the scope covers
Seven steps you would otherwise arrange with several companies. With us they sit under one responsibility.
8 steps
from design to service
Industries where the power must never fail
Questions that come up before the first meeting
How long does it take to connect a new hall to the grid?
It is decided by the distribution company and the capacity available locally, not by the installation work. That is why we file the connection request at the design stage — [X] months before production is due to start.
Can you work during live production?
Yes. We plan refurbishments in phases and carry out switchovers during shutdowns agreed in advance — typically a weekend or a night shift.
Do you buy switchboards or make them?
We make them. LV switchboards to STN EN 61439 with a declaration of conformity and routine testing before dispatch. You do not wait for a supplier and changes are handled directly.
Is solar worth it on a hall?
For daytime operations, usually yes — the hall consumes most of the output directly. We calculate the payback from your real consumption data, not from a table.
What do we receive at handover?
An inspection report, as-built drawings, test protocols, manuals and operator training — documentation that both the building authority and your insurer will accept.