Contact
Write or call. We will tell you what is realistic, where you can save and what decides the connection date.
Do you have a hall or a hall design?
Send us the key details — type of building, floor area, required power input, and timeframe. We will get back to you within 2 working days with what is feasible.
FAQ
Questions that come up before the first meeting
How long does it take to connect a new hall to the grid?
It is decided by the distribution company and the capacity available locally, not by the installation work. That is why we file the connection request at the design stage — [X] months before production is due to start.
Can you work during live production?
Yes. We plan refurbishments in phases and carry out switchovers during shutdowns agreed in advance — typically a weekend or a night shift.
Do you buy switchboards or make them?
We make them. LV switchboards to STN EN 61439 with a declaration of conformity and routine testing before dispatch. You do not wait for a supplier and changes are handled directly.
Is solar worth it on a hall?
For daytime operations, usually yes — the hall consumes most of the output directly. We calculate the payback from your real consumption data, not from a table.
What do we receive at handover?
An inspection report, as-built drawings, test protocols, manuals and operator training — documentation that both the building authority and your insurer will accept.