LV/MV transformer stations and switchrooms

Utility lead times are the longest item in the schedule. That is why we tackle them first.

We build the hall's power hub as one package
From design and utility approvals through equipment supply to connection and commissioning. Packaged and masonry transformer stations, MV and LV switchrooms, power factor correction.
Scope of delivery
Type
Includes
Critical
What we handle
The transformer station and switchroom are the power hub of the whole hall. We deliver them complete — from design and utility approvals through equipment supply to connection and commissioning.
We build packaged and masonry transformer stations and MV and LV switchrooms, including reactive power compensation and metering.
How it works
We apply for connection and reserved capacity as early as possible, because utility lead times are the longest item in the schedule.
The result is a power hub ready for the equipment to be connected, with tests, inspections and records for the utility.